teacher_01.gif teacher_02.gif teacher_03.gif
teacher_04.gif teacher_05.gif teacher_06.gif
teacher_07.gif teacher_08.gif
teacher_09.gif
 

 

 
 
课程表
照片
line01.gif
spacer.gif
dot_01.gif
中文姓名 杜莹美
spacer.gif
dot_01.gif
英文姓名 Amy Tu
spacer.gif
dot_01.gif
职  称 副教授
spacer.gif
dot_01.gif
学历学位 国立交通大学工业工程与管理博士
spacer.gif
dot_01.gif

个人网站

http://

spacer.gif
dot_01.gif
电子信箱 amytu@chu.edu.tw
spacer.gif
dot01_.gif

办 公 室

M529

line02.gif
   
  专长
 
       
 
dot_03.gif

生产管理、半导体生产管理与现场管理、 供应链管理

 
   
  研究成果
   
 
  期刊部份  
 
dot_03.gif

Rong-Kwei Li, Ying-Mei Tu and Tao H Yang (1993), "Composite Feature and Variational Geometry Concepts on Feature-based Design System," International Journal of Production Research, Vol. Vol. 31, No. No. 7, pp. 1521-1549. (SCI)

 
 
dot_03.gif

Ying-Mei Tu and Rong-Kwei Li, (1998), "Constraint Time Buffer Determination Model," International Journal of Production Research, Vol. Vol. 36, No. No. 4, pp. 1091-1103. (SCI)

 
 
dot_03.gif

张盛鸿,冯钰敏,杜莹美,黄承龙与李荣贵 (1999) , 「以限制理论为基础之晶圆制造厂派工法则」,中国工业工程学刊,Vol. 16, No. 2 ,第 209-220 页。 (TSSCI芠诡虫)

 
 
dot_03.gif

Chang, S.-H., Y.-M. Feng, Y.-M. Tu, C.-L. Huang and R.-K. Li (1999), "A TOC-Based Dispatching Rule for Semiconductor Wafer Fabrication," Journal of the Chinese Institute of Industrial Engineering, Vol. 2, No. 16, pp. 209-220. (TSSCI)(In Chinese)

 
 
dot_03.gif

Ying-Mei Tu, Yu-Hsiu Chao, Sheng-Hung Chang and Huan-Chung You (2005), "Model to Determine the Backup Capacity of a Wafer Foundry," International Journal of Production Research, Vol. Vol. 43, No. No. 2, pp. 339-359. (SCI)

 
 
dot_03.gif

严永海、 张盛鸿、 杜莹美、 李荣贵 (2005) , 「限制理论在产品组合的应用─以导线架厂为例」,明新学报,第 31 期,第 147-160 页。 ()

 
 
dot_03.gif

Yung-Hai Yen, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2005), "An Application of Theory of Constraints in Product Mix ─ A case of IC Lead Frame Factory," Ming Hsin Journal, Vol. , No. 31,, pp. 147-160. (In Chinese)

 
 
dot_03.gif

Ying-Mei Tu and Chuen-Shiuan Liou (2006), "Capacity Determination Model with Time Constraints and Batch Processing in Semiconductor Wafer Fabrication," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol 23, No. No 3, pp. 192-199. (TSSCI)

 
 
dot_03.gif

张盛鸿、宋南豪 、 杜莹美 (2006) , 「应用关键链方法建立稳健专案管理系统」,明新学报,第 32 期,第 289-309 页。

 
 
dot_03.gif

Sheng-Hung Chang, Nan-Hao Sung and Ying-Mei Tu (2006), "Establish Robust Project Management System by Using Critical Chain Methodology," Ming Hsin Journal, Vol. , No. 32, pp. 289-309. (In Chinese)

 
 
dot_03.gif

Po-Hsien Kuo, Ying-Mei Tu, Sheng-Hung Chang, and Rong-Kwei Li (2008), "A Research on Decision Support System for New Product Project Portfoliy," Ming Hsin Journal, Vol. No. 1, pp. 107-126, No. Volume 34, pp. 107-126. (In Chinese)

 
 
dot_03.gif

郭勃显、杜莹美、张盛鸿、李荣贵 (2008) , 「新产品专案组合决策系统之研究」,明新学报,第1卷,第 34 期,第 107-126 页。

 
 
dot_03.gif

Ying-Mei Tu and Hsin-Nan Chen (2009), "Tool Portfolio Planning In The Back-End Process of Wafer Fabrication With Sequential Time Constraints," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol. 26, No. No. 1, pp. 60-69. (EI)

 
 
dot_03.gif

Ying-Mei Tu and Hsin-Nan Chen (2009), "Capacity Planning With Sequential Two-Level of Time Constraints in The Back-End of Wafer Fabrication," International Journal of Production Research, Vol. Vol.47, No. No. 23, pp. 6967-6979. (SCI)

 
 
dot_03.gif

Ying-Mei Tu, Chun-Wei Lu and Sheng-Hung Chang (2009), "Model To Determine A General X-Factor Contribution And Apply To Cycle Time Improvement For Wafer Fabrication," Int. J. Services Operations and Informatics, Vol. Vol. 14, No. No. 3, pp. 272-291. (EI)

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen and Sheng-Hung Chang (2010), "The Design of KPI on Technology Development of Wafer Foundry," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol. 27, No. No. 5, pp. 351-362. (EI)

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2010), "Capacity Planning With Sequential Time Constraints Under Various Control Policies in The Back-End of Wafer Fabrications," Journal of Operations Research Society, Vol. Vol. 61, No. No. 8, pp. 1258-1264. (SSCI)

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen and Tsai-Feng Liu (2010), "Shop-Floor Control Model of Wafer Fabrication for Batch Operations with Time Constraints," International Journal of Industrial Engineering-Theory, Applications and Practice, Vol. 17, No. 2, pp. 142-155. (SCI)

 
 
dot_03.gif

Amy H. I. Lee, Chun-Yu Lin, Shu-Ru Wang and Ying-Mei Tu (2010), "The construction of a comprehensive model for production strategy evaluation," Fuzzy Optimization and Decision Making, Vol. Vol. 9, No. No. 2, pp. 187-217. (SCI)

 
 
dot_03.gif

杜莹美、 黄英钰、陈欣男 (2010) , 「晶圆制造厂内具时间限制的生产线段之现场管控模式」,中华管理学报,第十一卷, 第一期 ,第 1-22 页。

 
   
 
  研讨会部份  
 
dot_03.gif

杜莹美、 李荣贵 (1990) , 特徵基础设计系统中复合特徵与修正式几何的应用」, 中国工业工程学会七十九年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Rong-Kwei Li " (1990), "Composite Feature and Variational Geometry Concepts on Feature-based Design System," 79 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

杜莹美、 张盛鸿、 李荣贵 (1998) , 晶圆制造厂在制品分布图之建立」, 中国工业工程学会八十七年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Sheng-Hung Chang and Rong-Kwei Li (1998), "WIP Profile Determination Model for Wafer Foundry," 87 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

杜莹美、 赵裕修 (2001) , 晶圆代工厂产能支援决策模式」, 中国工业工程学会九十年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Yu-Hsiu Chao (2001), "Capacity Backup Model for Wafer Foundry," 90 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

Ying-Mie Tu and Hsin-Nan Chen (2003), "The influence of forecasting accuracy and information sharing of collaboration in supply chain"," 2003 International Conference on Industrial Engineering & Engineering Management, , Shang-Hai, China, pp. 239-239.

 
 
dot_03.gif

杜莹美、 赵裕修、 张盛鸿 (2003) , 晶圆代工厂中产能支援之绩效影响评估模式」, 中国工业工程学会九十二年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Yu-Hsiu Chao, Sheng-Hung Chang (2003), "Performance Evaluation Model for Wafer Foundry Under Capacity Backup," 92 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

杜莹美、 陈欣男 (2004) , 等候时间限制问题下机台当机时间长短对生产绩效之影响」, 中国工业工程学会九十三年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

杜莹美、 黄英钰 (2004) , 晶圆制造厂内等候时间限制机台之现场管控模式」, 中国工业工程学会九十三年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

翁立宇、 张盛鸿、 杜莹美、 李荣贵 (2004) , 限制理论应用在配销管理之实证研究」, 中国工业工程学会九十三年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

林志翰、 张盛鸿、 杜莹美、 李荣贵 (2004) , 瓶颈漂移问题之分析与研究」, 中国工业工程学会九十三年度年会暨学术研讨会,,,第 -页。

 
 
dot_03.gif

杜莹美、 林忠文 (2004) , 晶圆代工厂时间限制下之产能决策模式」, 第一届管理知识与技术提升学术研讨会,,,第 -页。

 
 
dot_03.gif

Li-Yu Weng, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2004), "Apply TOC on Distribution Management," 93 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

Zhi-Han Lin, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2004), "Research on Bottleneck Shift," 93 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

杜莹美、刘醇玄、张逸辉 (2005) , 等候时间限制问题下批量生产机台之产能决策模式」, 中国工业工程学会九十四年度年会暨学术研讨会,,新竹,第 -页。

 
 
dot_03.gif

杜莹美、刘采风 (2005) , 时间限制下晶圆厂批量机台之现场管控模式」, 中国工业工程学会九十四年度年会暨学术研讨会,,新竹,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2005), "The Influence of Machine Downtime in a Queuing System - A Simulation Study," APIEMS 2005 CONFERENCE, , MANILA, Philippines, pp. -.

 
 
dot_03.gif

郭勃显、 张盛鸿、 杜莹美、 李荣贵 (2005) , 新产品专案组合决策系统之研究」, 中国工业工程学会九十四年度年会暨学术研讨会,,中华大学,第 -页。

 
 
dot_03.gif

Ying-Mei Tu, Chuen-Shiuan Liou and I-Huei Chang (2005), "Capacity Determination Model of Batch Processing in Semiconductor Wafer Fabrication under Time Constraints," 94 Annual Conference of Chinese Institute of Industrial Engineers, , Hsin-Chu, ROC, pp. 209-220.(In Chinese)

 
 
dot_03.gif

Ying-Mei Tu, Tsai-Feng Liu (2005), "Shop Floor Control of Batch Machines Under Time Constraints," 94 Annual Conference of Chinese Institute of Industrial Engineers, , Hsin-Chu, ROC, pp. 209-220.(In Chinese)

 
 
dot_03.gif

Po-Hsien Kuo, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2005), "A Research on Decision Support System for New Product Project Portfoli," 94 Annual Conference of Chinese Institute of Industrial Engineers, , Hsin-Chu, ROC, pp. -.(In Chinese)

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2005), "The Influence of Machine Downtime Duration in Production Performance," 94 Annual Conference of Chinese Institute of Industrial Engineers, , Hsin-Chu, ROC, pp. -.(In Chinese)

 
 
dot_03.gif

Ying-Mei Tu and Ying-Yu Huang (2005), "Shop Floor Control Model for Wafer Foundry Under Time Constraints," 93 Annual Conference of Chinese Institute of Industrial Engineers, , , ROC, pp. -.(In Chinese)

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2006), "Waiting Time Approximation with Resource Failure," International Conference of Pacific RIM Management, , Hawaii, USA, pp. -.

 
 
dot_03.gif

Ying-Mei Tu, Chun-Wei Lu (2006), "Model to Determine the Hot Run Ratio of a Wafer Fabrication Factory under Time Constraints," International Conference of Pacific RIM Management, , Hawaii, USA, pp. -.

 
 
dot_03.gif

Huan-Chung You, Ying-Mei Tu, Joseph Z. Shyu (2006), "Strategic Clustering of Innovation in Catching up Economies," 15th International Conference on Management of Technology, , Beijing, China, pp. -.

 
 
dot_03.gif

Ying Mei Tu & Chiu-Ling Chen (2006), "The Influence of Arrival Smoothing between Batch and Serial Processes on System Performance," The 7th Asian Pacific Industrial Engineering and Management Systems Conference, , Bangkok, Thailand, pp. -.

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2007), "Model to Determine the Capacity of a Wafer Foundry with Sequential Time Constraints," International Conference of Pacific RIM Management, , Las Vegas, USA, pp. -.

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2008), "Shop-Floor Control Model in Batch Processes of Wafer Fabrication with Time Constraints," 19th Annual Conference of the Production and Operations Management Society, , , USA, pp. -.

 
 
dot_03.gif

Ying-Mei Tu, Hsin-Nan Chen (2008), "The Effect of Downtime Frequency at Fixed Machine Availability in Queuing Systems," 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, , , China, pp. -.

 
 
dot_03.gif

Ying-Mei Tu, Chun-Wei Lu (2008), "A General X-Factor Determination Model for Wafer Fabrication〃, 2008 IEEE International Conference on Service Operations and Logistics, and Informatics," 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, , , China, pp. -.

 
 
dot_03.gif

Ying-Mei Tu (2008), "Capacity Planning for Batch-Serial Processes with Time Constraints in Wafer Fabrication," 2008 Global Business & International Management Conference, , Portland, USA, pp. -.

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu) (2011) , Shop Floor Control Model for Wafer Fabrication and Flip Chip」, The Tenth International Conference on Information and Management Science (IMS2011),Lhasa,,第 109-115页。

 
 
dot_03.gif

1.陈欣男(Hsin-nan Chen)2.杜莹美(Ying Mei Tu) (2011) , Service Time Modification and Capacity Planning with Service Interruptions in a Service System」, 2011两岸工业工程与管理学术研讨会,新竹,,第 1-5页。

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu)2.吕宛蓉(Wan-Rong Lu)3.冯思萍(Si-Ping Feng) (2012) , Product Arrival Prediction by Regression Analysis in Wafer Fabrication」, The 3rd Conference on Engineering and Business Management (EBM2012),Shanghai,,第 3598-3601页。

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu)2.陈欣男(Hsin-Nan Chen)3.陈伟杰(Wei-Chieh Chen)4.高永欣(Yung-Hsin Kao)5.叶俊江(Chun-Chiang Yeh) (2012) , Model to Determine the Number of Factors for Neural Network Forecasting System」, The 3rd Conference on Engineering and Business Management (EBM2012),Shanghai,,第 1561-1564页。

 
 
dot_03.gif

1.卢俊伟(Chun-Wei Lu)2.杜莹美(Ying Mei Tu) (2012) , A Model to Control Capacity Backup for Twin Fabs of Wafer Fabrication」, The 3rd Conference on Engineering and Business Management (EBM2012),Shanghai,,第 3594-3597页。

 
 
dot_03.gif

1.王昭宜(Chao-I Wang)2.杜莹美(Ying Mei Tu) (2012) , The model to determine optimal timing of capacity replacement for manufacturing technology upgrades」, The 3rd Conference on Engineering and Business Management (EBM2012),Shanghai,,第 3629-3632页。

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu) (2012) , Production Planning and Control Model of Technology Migration for DRAM Industry」, ICINCO 2012 9th International Conference on Informatics in Control, Automation and Robotics,Rome,,第 599-603页。

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu)2.王昭宜(Chao-I Wang) (2013) , Technology Migration Determination Model For DRAM Industry」, 15th International Conference on Enterprise Information Systems (ICEIS 2013),Angers,,第 455-460页。

 
 
dot_03.gif

1.杜莹美(Ying Mei Tu)2.张哲豪(Che-Hao Chang) (2014) , Giga-fab Scale Determination Model for Wafer Fabrication Based on Production Performances」, The World Congress on Engineering (WCE 2014),London,,第 1-5页。

 
   
 
  研究计划部份  
 
dot_03.gif

在制品水准决定模式 (89-2213-E-216-047- 2000-08-01~2001-07-31)

 
 
dot_03.gif

晶圆代工厂产能支援决策模式 (90-2218-E-216-001- 2001-08-01~2002-07-31)

 
 
dot_03.gif

备用零件需求预测与存货管理系统—光电仪器设备业为例 (93-2622-E-216-018-CC3 2004-08-01~2005-07-31)

 
 
dot_03.gif

以TOC绩效衡量方法发展BI系统 (94-2213-E-009-077- 2005-08-01~2006-07-31)

 
 
dot_03.gif

晶圆制造厂连续型时间限制问题之产能决策模式 (aaa 2005-08-01~2006-07-31)

 
 
dot_03.gif

打破市场制约的可行愿景研究—TOC方法 (95-2221-E-009-191- 2006-08-01~2007-07-31)

 
 
dot_03.gif

晶圆制造厂在时间限制下之产能规划与现场管控决策模式(I) (95-2221-E-216-014 2006-08-01~2007-07-31)

 
 
dot_03.gif

晶圆制造厂在时间限制下之产能规划与现场管控决策模式(I) (NSC 95-2221-E-216-014 ~)

 
 
dot_03.gif

有效降低研发时程和WIP的多重专案规划与控管方法之研究(I) (96-2221-E-159-001- 2007-08-01~2008-07-31)

 
 
dot_03.gif

晶圆制造厂在时间限制下之产能规划与现场管控决策模式(II) (96-2221-E-216-038- 2007-08-01~2008-07-31)

 
 
dot_03.gif

晶圆制造厂在时间限制下之产能规划与现场管控决策模式(II) (NSC 96-2221-E-216-038 ~)

 
 
dot_03.gif

双子星晶圆厂之生产支援决策模式 (97-2221-E-216-031-MY2 2008-08-01~2010-07-31)

 
 
dot_03.gif

双子星晶圆厂之生产支援决策模式 (NSC 97-2221-E-216-031-MY2 ~)

 
 
dot_03.gif

双子星晶圆厂之生产支援决策模式 (NSC 97-2221-E-216-031-MY2-2 ~)

 
 
dot_03.gif

晶圆制造厂在时间限制下之产能规划模式 (099-B03-001 ~)

 
 
dot_03.gif

专案开案数量及资源负载对专案绩效之影响分析 (99-2221-E-159-007 2010-08-01~2011-07-31)

 
 
dot_03.gif

整合式生产策略规划与管控模式-从晶圆制造到覆晶封装(I) (NSC 99-2221-E-216-029 ~)

 
 
dot_03.gif

制程技术世代转换之整合规划模式-以DRAM产业为例(1/2) (NSC 100-2628-E-216-002-MY2 ~)

 
 
dot_03.gif

制程技术世代转换之整合规划模式-以DRAM产业为例(2/2) (NSC 100-2628-E-216-002-MY2-2 ~)

 
 
dot_03.gif

超大型晶圆厂之设计、规画与管控整合模式(Ⅰ) (NSC 102-2221-E-216-030 ~)

 
 
dot_03.gif

超大型晶圆厂之设计、规划与管控整合模式(II) (MOST 103-2221-E-216-021 ~)

 
   
  书籍
 
       
   
  荣誉
   
 

 

 
                          中华大学·工业工程与系统管理学系·版权所有
teacher_15.gif
spacer.gif spacer.gif spacer.gif spacer.gif spacer.gif